Sunday, April 4, 2010

Day 4

We have a ceiling again! The drywallers spent most of the day putting up the ceiling and covering the new soffit area. Still plenty of little piddly stuff to do--they will be here most of next week.

We also have the base frame for our new range hood. It will need to be drywalled, textured, painted, etc.





The new window was scheduled to be installed but wasn't the right size. Another measuring error...

We have had two addendums so far (addendi?). There is an extra cost for the light over the sink. This was expected because they weren't sure how they would do that until they had fully removed the old soffits. Second, we had requested separating the circuit/switch that will control the under-cabinet lighting and the ambient rope lighting above the cabinets, and there is a small charge for that.

The bigger issue is the "change order" for the two new skinny cabinets to fill out the refrigerator wall (see Days 2 and 3). There was a measuring error somewhere between the site inspection and design phase. Is that a change... or a fix?

Dinner: Sausage Spaghetti Pie (very good leftover!)